Quick answer
What should you do before starting a renovation?
Before work begins, define what the renovation includes, set a realistic budget, understand the order of work, confirm contractors, make the decisions that could block progress, check material lead times and gather the documents everyone will need.
- Scope
- Budget
- Timeline
- Decisions
- Quotes
- Materials
- Preparation
- Start
01
Define exactly what you are renovating
Start by deciding what is inside the project and what is not. Renovations become difficult to control when the scope is vague or keeps expanding after work begins.
Write down:
- Which rooms or areas are included
- What will be removed
- What will be repaired
- What will be replaced
- What will stay
- Whether layouts will change
- Whether plumbing or electrical work is involved
- Whether structural work might be needed
Then divide the scope into two groups:
- Must have
- Work that is essential for the project to succeed.
- Nice to have
- Improvements you would like to include if budget and time allow.
This distinction is useful later if costs increase or the timeline becomes tighter than expected.
Practical checklist
- List every room or space involved
- Describe the intended outcome
- Identify structural changes
- Identify plumbing changes
- Identify electrical changes
- Separate essential work from optional work
02
Set a working budget
Decide how much you are prepared to spend before you begin choosing finishes and products. Break the budget into meaningful categories rather than keeping only one overall number.
- Contractor work
- Materials
- Fixtures and fittings
- Appliances
- Professional services
- Permits or approvals where applicable
- Delivery and waste removal
- Temporary accommodation if relevant
- Contingency
Your first budget does not need to be perfect. Its purpose is to give you a framework for making decisions and comparing alternatives.
Keep estimates, committed costs and actual costs separate. They answer different questions.
03
Understand the property before work starts
A renovation plan should reflect the home you actually have, not only the home you want to create. Before starting, gather the information that could affect the project. This may include:
- Existing floor plans
- Measurements
- Construction type
- Electrical systems
- Plumbing locations
- Heating systems
- Previous renovations
- Known defects
- Relevant property records
- Warranties
- Manuals
For older properties or substantial work, professional surveys or specialist advice may be appropriate before construction starts.
04
Build the renovation timeline
Put the major phases in the order they need to happen. A typical structure might include:
- 1Planning and design
- 2Contractor selection
- 3Ordering
- 4Preparation
- 5Demolition
- 6Structural and hidden work
- 7Installation
- 8Finishing
- 9Snagging
- 10Handover
The important part is not the exact labels. It is understanding which activities depend on others.
05
Make decisions that could block the work
Many renovation delays happen because a decision has not been made when a contractor needs it. Identify decisions that need deadlines, for example:
- Room layouts
- Flooring
- Tiles
- Wall finishes
- Lighting
- Switches and sockets
- Sanitary fittings
- Kitchen appliances
- Doors
- Handles
- Worktops
- Paint colours
Do not wait until installation day to make decisions that affect earlier work.
Ask this for every major decision
When does someone else need this answer?
06
Get and compare quotes
A quote should help you understand both the cost and what is actually included. When comparing contractors, look beyond the total price. Check:
- Scope of work
- Materials included
- Exclusions
- Payment schedule
- Estimated start date
- Estimated duration
- Responsibility for waste removal
- Responsibility for ordering
- Warranties or guarantees
- How changes will be handled
If two quotes describe different scopes, comparing only the final number can be misleading.
Before accepting a quote
- Scope is clear
- Exclusions are clear
- Start date discussed
- Payment terms understood
- Responsibilities understood
- Changes and extras discussed
07
Check materials and lead times
Do not only decide what you want. Find out when it can arrive. Long-lead items can determine the entire project schedule. Potential examples include:
- Kitchens
- Windows
- Doors
- Custom joinery
- Tiles
- Specialist fittings
- Appliances
- Worktops
For important products, record
- Decision deadline
- Order date
- Expected delivery
- Installation date
Schedule backwards from when the item is needed.
08
Prepare the home
Think about how the renovation will affect the rest of the household. Consider:
- Which areas will remain usable
- Access for contractors
- Where materials can be stored
- Dust protection
- Waste collection
- Parking or delivery access
- Pets and children
- Temporary cooking or washing arrangements
- Valuables and furniture
- Keys and access
A small amount of preparation can remove a surprising amount of daily friction once construction starts.
09
Put the project information in one place
Before the project becomes busy, decide where you will keep the information everyone will need. This may include:
- Quotes
- Contracts
- Drawings
- Receipts
- Product links
- Measurements
- Decisions
- Contractor details
- Warranties
- Tasks
- Photos
- Budget information
Scattered information becomes harder to manage as the project grows.
Before construction begins
- Scope agreed
- Working budget created
- Important property information collected
- Major timeline established
- Contractors confirmed
- Quotes and agreements saved
- Key decisions made
- Long-lead products ordered
- Contractor access arranged
- Furniture and valuables protected
- Project documents organized
- Important contact details saved
- Known risks discussed
- First project milestone confirmed